OVERVIEW
TIG SA planned the construction of a new industrial building in Bulle and relies on surface geothermal energy as an energy source.
For this building, GEOEG designed and optimized a geothermal borehole field with thorough consideration of the opportunities provided by different pipe configurations for the boreholes, including double U and coaxial configurations.
project summary
kW of supplied renewable energy
m² of conditioned spaces